  4.B.       
Planning & Zoning Commission
Meeting Date: 01/11/2023  
Submitted By: Sam Haas, Planner

GENERAL INFORMATION:
Owner/Applicant:Parklands Units 1 & 2, LTD.
Projet Engineer: KFW Engineers
APPLICATION SUBMITTAL DATE:
Date:  Application Submittal Type:
12-28-2022 Final Plat
ITEM SUMMARY:
The applicant is proposing to final plat approximately 7 acres of land into 14 buildable single-family residential lots. All 14 of the lots in Unit 2B will be ‘SF 50’ lots with a minimum size of 6,000 square feet as dictated by the Parklands PDD (Ordinance 13-S-36).
 
Lot Code Area (sq. ft.) Width (ft.) Depth (ft.)
SF 50 6,000 50 120

The item was previously approved at the November 18, 2020, Planning and Zoning Commission Meeting. Per the Unified Development Code (UDC), approved plats have a two-year expiration date in which the final plat must be recorded. Prior to recordation all public improvements are to be completed. Public improvements were recently completed, but not within this two-year time frame. Since the two-year expiration has occurred, in order to record the final plat it must be re-approved by the Planning and Zoning Commission. Thus, the applicant has resubmitted the previously approved plat. No changes or modifications are proposed with this final plat, it has been resubmitted strictly due to the two-year expiration occurring. 
GENERAL LOCATION AND SITE DESCRIPTION:
The subject property is currently undeveloped and generally located approximately 3,000 feet southeast of the intersection between Eckhardt Road and Parklands Way.
ACCESS AND CIRCULATION:
Unified Development Code (UDC) Article 14 requires that all residential subdivisions have a minimum of two (2) locations accessing existing public streets. This development is designed to have two (2) points of access via Parklands Way along with access to Park Cape which was constructed with Parklands Unit 2A.  
TREE MITIGATION AND PRESERVATION:
The applicant is responsible for complying with Unified Development Code (UDC) Section 21.9.9 Tree Preservation and Mitigation. The applicant has submitted a tree affidavit indicating the site has no Protected or Heritage trees
PUBLIC SERVICES:
The site is serviced by Schertz Water and Sewer, Cibolo Creek Municipal Authority (CCMA), Center Point Energy, Guadalupe Valley Electric Cooperative (GVEC), AT&T, and Spectrum.
PUBLIC IMPROVEMENTS:
All public improvements required for this subdivision are required to be installed prior to recording of the final plat per UDC, Section 21.4.15., unless otherwise specified in an approved development agreement. 

Water and Sewer: The site will be serviced through 8” water lines and 8” sewer lines that will be extended throughout the subdivision and stubbed for future development.

Drainage: The applicant is responsible for all drainage associated with the subject property, and for compliance with the Storm Water regulations. A Stormwater Management Plan has been reviewed and approved by the City Engineer.

Sidewalks, Hike and Bike Trails: Sidewalks will be constructed along both sides of the street throughout the subdivision. A meandering all weather 10’ wide hike and bike trail will be constructed along the northern side of the internal collector street (Parklands Way), with a standard 5’ sidewalk to be constructed on the south side. All sidewalks will be designed to meet City of Schertz Specifications.

Road Improvements: All streets will be developed to City of Schertz specifications.

Parks: All parkland requirements have been completed, no fees are required. An approximately 9 acre park will be dedicated with Parklands Subdivision Unit 3A, but there is no public parklands being dedicated with the Unit 2B plat. The public parkland amenities include both passive and active areas, as well as pathway and hike and bike trails which will provide links between the city park, open spaces, and neighborhoods. 
STAFF ANALYSIS AND RECOMMENDATION:
The final plat is consistent with applicable requirements for the property, ordinances and regulations. It has been reviewed with no objections by Planning, Engineering, Public Works, and Fire. Staff recommends approval of the final plat as submitted.
 
Planning Department Recommendation  
X Approve as submitted
  Approve with conditions*
  Denial
* While the Commission can impose conditions; conditions should only be imposed to meet requirements of the UDC.
COMMISSIONERS CRITERIA FOR CONSIDERATION:
The Planning and Zoning Commission is the final approval authority of the proposed Final plat. In considering final action on a Final plat, the Commission should consider the criteria within UDC, Section 21.12.10 D.